← Back to Inspections
New Inspection Report
PMI
LOLER
PUWER
Job ID (optional link)
Customer
Vehicle Reg
Location (optional)
Engineer sets interval
Interval (months)
Next due date
Put either months, a date, or both — totally up to the engineer.
Result
PASS
FAIL
PMI Checklist
Lights / reflectors OK
Tyres OK (tread / damage)
Brakes / air lines visual OK
No visible leaks
Body / chassis condition OK
Notes
Add photos (optional)
Save Report